A client asks for a different scope or price. You update the proposal and send it again. Then a week later someone opens an earlier attachment and asks which terms are current. This is how “proposal_final_v2” starts multiplying.
Keep a separate, dated version for each material change. Make the current copy obvious, record what changed and preserve the exact version the client accepted. That gives both sides a clear reference without turning every small edit into a new proposal.
Make a new version when the offer changes
A new revision is useful when the client or your team changes something that affects the decision: scope, price, deliverables, schedule, assumptions or validity. A spelling correction in an unsent draft may not need a new numbered version. A changed delivery date after the proposal was sent does.
If you are presenting options, label them inside the same proposal so the client can compare them. If the client chooses an option or asks for a different combination, issue a new revision that shows the selected scope and the resulting price clearly.
Write down what changed
At the top of the new proposal or in the email, add a short revision note:
- Revision number and date.
- What changed from the previous version.
- What stayed the same.
- Any assumption or open question that affects the price or schedule.
For example: “Revision 03 adds the two extra site visits discussed on 14 November. The earlier delivery date remains unchanged. The total is updated to ₹[amount].” Keep the note factual and ask the client to confirm any point that is still undecided.
Separate the working file from the copy you sent
Use one simple naming pattern and apply it consistently. A file such as ClientName – Proposal – v03 – 2026-11-15 is easier to identify than a chain of “final”, “final-new” and “final-revised” attachments. Keep earlier sent versions in a previous-revisions folder or project record; mark them as superseded so nobody sends one by mistake.
Before sending, open the PDF or document you attached and check its revision number, price, scope and date. The filename, email text and document should all refer to the same version.
Make the email say exactly which version is current
Do not rely on the recipient to compare attachments. Tell them which revision you are sending, what changed and what you need them to do next.
Hi [Name],
Attached is proposal revision 03, dated [date]. It updates [scope or price] based on our discussion and replaces revision 02 as the current draft. Please review [specific section] and reply to confirm whether this version matches what you want to proceed with. I’ll wait for your written approval before starting the revised work.
Thanks,
[Name]
Use language that matches your actual agreement and process. Do not imply that a proposal is accepted just because the client asked a question or opened the attachment. For a separate follow-up cadence, see how to follow up after sending a business quote.
Keep the accepted version with the project
When the client approves, save the exact proposal they accepted alongside the related project files. Add a short dated update stating which revision was approved, who confirmed it and what the next action is. Keep the email or other written confirmation available as well.
If the client requests another change after approval, do not quietly edit the accepted copy. Prepare a new revision and make clear what changed. This keeps the agreed reference intact while the new request is being reviewed.
Where Yuti fits
Yuti Projects keep related working files, updates and recoverable version snapshots together in the team workspace. Your team can save a proposal revision with the project and record which copy was sent or accepted. A snapshot can help recover an earlier file, but it does not tell you which version the client approved; record that decision separately.
Business email keeps the client conversation in the mailbox, while project updates keep the team’s decision and next step visible. Those channels do not merge automatically, so attach or identify the exact revision in the project record. Explore the Yuti business workspace or read how to keep project files and handoffs clear.
Frequently asked questions
Should I overwrite the proposal after sending it?
Keep a new dated revision when the client is reviewing it or when the terms change. Preserve the earlier sent copy so the team can see what the client originally received.
How many proposal versions should I keep?
Keep each version that was sent or materially changed, along with the accepted version. You do not need to number every internal spelling correction in an unsent draft.
Does file version history prove that a client approved a proposal?
No. File history helps you recover or identify earlier copies. Keep the client’s approval and the exact accepted proposal together in the project record.