An architect described multiple revisions of many drawings copied into nested REV A, REV B, and REV C folders. As revisions accumulated, teams could no longer tell which copy was current without inspecting each file.
What the workflow needs
Replies suggested separating the current issue from dated or milestone archives, and keeping a drawing register so history is preserved without making every old copy look active.
A workflow the team can keep
- Keep one clearly named current issue set
- Move prior issued PDFs into dated or revision-marked archive folders
- Record which sheets changed in each issue
Test the workflow on one active project
Choose a recent hand-off where people have had trouble finding or trusting a file. Put the working material in the agreed project home, name the person who maintains the current set, and decide what event deserves a saved version. Ask a colleague who did not set up the folder to find the current item and a prior milestone copy without coaching. Their search is a useful test of whether the structure makes sense beyond its creator.
Before moving a larger archive, list any file types, access boundaries, retention rules or approval steps that need specialist handling. Keep the existing record available until a small sample has been checked by the people who use it.
Where SaraBiT Yuti fits
Yuti tracked project folders can keep current project files and saved file-set snapshots together. It is not a drawing register or CAD-aware document-control system; preserve the formal revision workflow your practice requires. Explore tracked project files.
Ready to compare the fit? Review Yuti plans or talk with SaraBiT about your team’s setup.
