← All articles

Team workspace · 4 MIN READ

Startup File Management: What Belongs in Which Tool?

Separate controlled CAD, project files, internal procedures, and media libraries by their needs, then give staff one source-of-truth map.

A four-person company can often get by with a shared drive, email, and a few workarounds. As the team grows, the same folder system may start carrying engineering drawings, ordinary project files, procedures, photos, and videos. Buying one tool for all of them can create the appearance of simplicity while leaving the controls each type of work needs unresolved.

Choose the system by the job each file must do, then give the team one clear rule for where the authoritative copy lives.

Match each kind of work to its control needs

  • CAD models and controlled drawings: If engineers need linked assemblies, check-out, bills of materials, or controlled releases, evaluate the CAD vendor’s PDM system. A general shared folder does not provide those controls.
  • Project documents: Contracts, briefs, meeting records, supplier documents, and deliverables usually need an agreed project folder, access for the right team members, and a way to recover earlier file sets.
  • Procedures and internal knowledge: Frequently updated how-to instructions are easier to maintain in a knowledge base or wiki with an owner and a clear current version than in a folder of exported documents.
  • Large photo and video libraries: If the team needs visual search, tags, licensing details, or reuse controls, assess a digital asset management system. Ordinary folders do not supply those features automatically.

Some tools overlap. The question is not whether the company can reduce its number of apps at any cost; it is whether each team can tell where to create, review, approve, and retrieve the current record.

Write down the source of truth for each file type

Make a one-page map with four columns: file type, authoritative system, owner, and how other tools should link to it. For example, a project folder can contain a PDF export and a link or reference to a controlled CAD model, while the PDM system remains authoritative for the model itself. Avoid saving another editable “master” in a second system unless the team has a clear synchronization rule.

Include practical requirements that affect the choice: offline access for field or travelling staff, file size, member access, recovery, retention, and who supports the system. Test these requirements with the people who do the work instead of relying only on a vendor feature list.

Pilot before migrating everything

  1. Choose one active project with examples of each important file type.
  2. Assign an owner for the source record in each system.
  3. Ask an engineer, project manager, and nontechnical teammate to find the right file and identify which copy is authoritative.
  4. Test an employee hand-off, an offline day if needed, and recovery of a prior project snapshot.
  5. Record gaps, access rules, and migration responsibilities before moving the remaining archive.

If people still send files through email because the agreed workspace is hard to use, fix the access or navigation problem before adding another platform.

Where SaraBiT Yuti fits

Yuti tracked Projects can provide an organisation-managed home for shared project files, with project membership and recoverable snapshots. It can support the ordinary project-document layer in a growing company. It does not replace SolidWorks PDM, a technical wiki, or a digital asset management library, and this guide does not promise offline access or automatic integration with those systems.

Explore Yuti tracked project files and the organisation workspace, or share your team’s requirements with SaraBiT.

Written by the SaraBiT team · More practical guides

WORKING THROUGH THIS YOURSELF?

We’d be glad to hear about your team’s needs.

Talk to SaraBiT