A request for quotation can begin as one email and quickly turn into many. A buyer sends the same part requirement to several suppliers, follows up on replies, compares price and lead time, and then learns that an engineering detail changed while quotes were still coming in.
Small manufacturers do not always need a large procurement system for every sourcing round. They do need one current specification, a clear record of who received it, and a reliable way to see which supplier has replied and what still needs a decision.
Give each RFQ a reference and an owner
Start with a short RFQ reference that connects the part or BOM line to the supplier messages and files. Name one person responsible for the specification and one person responsible for collecting supplier responses. In a small team, those may be the same person, but make the responsibility explicit.
For each supplier, record the contact date, specification revision sent, requested response date, reply status, next follow-up date and any important clarification. When a quote arrives, capture the quoted price, minimum order quantity, lead time and delivery terms in the comparison record. Keep the supplier’s original quote file alongside the entry.
Send the same version of the request to every supplier
Before sending, confirm that the drawing, part description, quantity, required delivery date and acceptance details are complete. Mark the specification revision and date in the document and in the email subject or opening lines. Ask suppliers to identify the revision they used in their quotation.
If a requirement changes, issue a numbered or dated clarification. State what changed, which previous version it replaces and whether the supplier should revise an existing quote. Send the update to everyone still quoting and record who received it. Do not silently replace the original attachment; a reviewer needs to see which version each supplier priced.
Make supplier follow-up a visible action
Choose a response date that fits the sourcing schedule. If a supplier has not replied by then, the assigned owner can send one concise follow-up that includes the RFQ reference and asks whether they can quote by a new date. If the timing changes, update the tracker so a colleague does not send a second message based on the old deadline.
Do not assume a sent message means the supplier received or accepted the request. Check the mailbox for replies, delivery failures or clarification questions. If a key quote is late, tell the internal decision-maker early enough to adjust the sourcing plan.
Compare like with like, and keep exceptions visible
When quotes arrive in different formats, put the comparable fields in one table: quoted part and revision, unit price, minimum quantity, tooling or setup cost where applicable, lead time, shipping terms, validity date and any assumptions. Mark missing details as “not confirmed” instead of guessing. A low price is not comparable if it applies to a different revision or quantity.
Keep unusual terms and supplier questions with the quote. If a supplier proposes an alternative material, finish or delivery schedule, ask the technical owner to review it before treating it as equivalent. Preserve the original request and quotation for the final purchasing record.
How SaraBiT Yuti can support the RFQ communication
SaraBiT Yuti provides organisation-domain business email and shared project files in an owner-managed workspace. A small manufacturing team can use its company mailboxes for supplier correspondence and keep RFQ documents in a project file set with access for the employees involved. File milestones can preserve a known set of project documents when the team needs a reference point.
Yuti does not compare supplier prices, track RFQ response status, create purchase orders or send automatic overdue reminders. Keep those procurement records in the process your company uses, and make sure each RFQ entry points to the correct message and specification revision. Explore Yuti business email, tracked project files and the owner-managed workspace, or talk with SaraBiT about your manufacturing team’s email and file setup.
A practical RFQ checklist for a small team
- Assign an RFQ reference and a responsible owner.
- Check the part description, drawing revision, quantity and required date before sending.
- Send the same current request to each supplier and record its revision.
- Set a reply date and a named person to check supplier responses.
- Record replies, clarifications and next actions in one procurement log.
- Compare price, minimum quantity, lead time and terms only when the quote scope matches.
- Issue specification changes as dated clarifications and ask suppliers to confirm the revision.
- Keep original emails and quote files with the final sourcing record.
Frequently asked questions
What should a small manufacturer track for each RFQ?
Track the RFQ reference, part or BOM line, supplier, specification revision, date sent, response due date, quote status, next action and the main commercial terms. Keep the original supplier quote available for review.
How should I handle a drawing change after sending an RFQ?
Send a dated clarification that identifies the changed requirement and the revision it replaces. Contact every supplier still preparing a quote, ask them to confirm the version they will use and record whether an existing quote needs revision.
Can Yuti compare supplier quotes or remind suppliers automatically?
No. Yuti supports the email and shared project-file workflow around sourcing. Quote comparison, RFQ status tracking and reminder timing remain part of your procurement process.
Should I create a separate mailbox for every supplier?
Usually the supplier correspondence can use the responsible employee’s business mailbox or a monitored purchasing address. Keep the RFQ reference in the subject and save the relevant correspondence with the sourcing record so the team can find it later.
